{"id":4585,"date":"2026-02-06T13:46:21","date_gmt":"2026-02-06T13:46:21","guid":{"rendered":"https:\/\/www.dockguard.com\/?p=4585"},"modified":"2026-02-06T13:47:20","modified_gmt":"2026-02-06T13:47:20","slug":"apm-terminals-callao-modernizing-perus-gateway-to-global-trade","status":"publish","type":"post","link":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/","title":{"rendered":"APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global Trade"},"content":{"rendered":"\n<h3 class=\"wp-block-heading has-text-align-left\"><strong>Project Overview:<\/strong><\/h3>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\">Case Study: APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global Trade<br>Project: Terminal Infrustructure Upgrade<br>Location: Port of Callao, Peru<br>Date: Completed 2021<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-left\"><strong>The Challenge<\/strong>: Scale and Logistics<\/h3>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\">With a requirement for over 130 fender units, the project demanded a partner who could manage large-scale manufacturing without compromising on precision. The logistics were equally complex, requiring a coordinated international delivery strategy to Callao under strict timelines to minimize operational downtime at the terminal.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-left\"><strong>The DockGuard Solution<\/strong><\/h3>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\">We provided a turnkey supply package centered around our high-performance Hollow Cylindrical and DD fender systems. Our solution focused on maximizing energy absorption while keeping reaction forces within the existing quay\u2019s structural limits.<\/p>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\">To ensure the project stayed on track, we implemented a strategic &#8220;part-shipment&#8221; logistics plan. By splitting the manufacturing across specialized facilities and dispatching the goods in multiple phases, we ensured a continuous supply of components for the installation team on-site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-left\"><strong>Key System Components:<\/strong><\/h3>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\"><strong>121 x Hollow Cylindrical Fenders:<\/strong> Engineered for 249.6 kNm energy absorption and 804 kN reaction force.<\/p>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\"><strong>18 x Hollow DD Fenders:<\/strong> Providing secondary protection with 15.96 kNm energy absorption.<\/p>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\"><strong>Bespoke Fixing Systems:<\/strong> Includes heavy-duty galvanised chains, U-bar anchors, and support brackets.<\/p>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\"><strong>Marine-Grade Durability:<\/strong> All rubber components were tested for ozone and seawater resistance to ensure a long service life in the Pacific marine environment.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-left\"><strong>Project Outcome<\/strong><\/h3>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\">The successful delivery of this project reinforces DockGuard\u2019s capability to handle large-scale international port expansions. By combining robust engineering with a flexible logistical approach, we provided APM Terminals with a resilient fendering solution that protects their assets and supports the seamless flow of global trade through the Port of Callao.<\/p>\n\n\n\n<p class=\"has-text-align-left wp-block-paragraph\"><br><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"279\" height=\"338\" data-id=\"4586\" src=\"https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/Picture3.png\" alt=\"\" class=\"wp-image-4586\" srcset=\"https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/Picture3.png 279w, https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/Picture3-248x300.png 248w, https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/Picture3-10x12.png 10w\" sizes=\"(max-width: 279px) 100vw, 279px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"576\" height=\"1024\" data-id=\"4587\" src=\"https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20220107_113357-576x1024.jpg\" alt=\"\" class=\"wp-image-4587\" srcset=\"https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20220107_113357-576x1024.jpg 576w, https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20220107_113357-169x300.jpg 169w, https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20220107_113357-768x1365.jpg 768w, https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20220107_113357-864x1536.jpg 864w, https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20220107_113357-1152x2048.jpg 1152w, https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20220107_113357-7x12.jpg 7w, https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20220107_113357-scaled.jpg 1440w\" sizes=\"(max-width: 576px) 100vw, 576px\" \/><\/figure>\n<\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2560\" height=\"1391\" src=\"https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20211215_121959-scaled.jpg\" alt=\"\" class=\"wp-image-4589\" srcset=\"https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20211215_121959-scaled.jpg 2560w, https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20211215_121959-300x163.jpg 300w, https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20211215_121959-1024x556.jpg 1024w, https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20211215_121959-768x417.jpg 768w, https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20211215_121959-1536x834.jpg 1536w, https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20211215_121959-2048x1113.jpg 2048w, https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20211215_121959-18x10.jpg 18w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Overview: Case Study: APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global TradeProject: Terminal Infrustructure UpgradeLocation: Port of Callao, PeruDate: Completed 2021 The Challenge: Scale and Logistics With a requirement for over 130 fender units, the project demanded a partner who could manage large-scale manufacturing without compromising on precision. The logistics were equally complex, requiring [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":4589,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[31,13,29],"tags":[54,55,42],"class_list":["post-4585","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-extruded-fenders","category-installations-archive","category-steel-fabrications","tag-cyclindrical-fender","tag-extruded-fender","tag-fender-panel"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"Project Overview: Case Study: APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global TradeProject: Terminal Infrustructure UpgradeLocation: Port of Callao, PeruDate: Completed 2021 The Challenge: Scale and Logistics With a requirement for over 130 fender units, the project demanded a partner who could manage large-scale manufacturing without compromising on precision. The logistics were equally complex, requiring\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Sam Hudson\"\/>\n\t<meta name=\"google-site-verification\" content=\"EAp_5lQIT6nXa5tcUrofXDLDOCDzTEu0GFMCm4EJ_Sk\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_GB\" \/>\n\t\t<meta property=\"og:site_name\" content=\"dockguard.com - Global provider of marine fender technology\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global Trade - dockguard.com\" \/>\n\t\t<meta property=\"og:description\" content=\"Project Overview: Case Study: APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global TradeProject: Terminal Infrustructure UpgradeLocation: Port of Callao, PeruDate: Completed 2021 The Challenge: Scale and Logistics With a requirement for over 130 fender units, the project demanded a partner who could manage large-scale manufacturing without compromising on precision. The logistics were equally complex, requiring\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.dockguard.com\/wp-content\/uploads\/2024\/04\/DG_long_logo_rev.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.dockguard.com\/wp-content\/uploads\/2024\/04\/DG_long_logo_rev.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-02-06T13:46:21+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-02-06T13:47:20+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global Trade - dockguard.com\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Project Overview: Case Study: APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global TradeProject: Terminal Infrustructure UpgradeLocation: Port of Callao, PeruDate: Completed 2021 The Challenge: Scale and Logistics With a requirement for over 130 fender units, the project demanded a partner who could manage large-scale manufacturing without compromising on precision. The logistics were equally complex, requiring\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.dockguard.com\/wp-content\/uploads\/2024\/04\/DG_long_logo_rev.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\\\/#blogposting\",\"name\":\"APM TERMINALS CALLAO Modernizing Peru\\u2019s Gateway to Global Trade - dockguard.com\",\"headline\":\"APM TERMINALS CALLAO Modernizing Peru\\u2019s Gateway to Global Trade\",\"author\":{\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/author\\\/samhudson\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.dockguard.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/20211215_121959-scaled.jpg\",\"width\":2560,\"height\":1391},\"datePublished\":\"2026-02-06T13:46:21+00:00\",\"dateModified\":\"2026-02-06T13:47:20+00:00\",\"inLanguage\":\"en-GB\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\\\/#webpage\"},\"articleSection\":\"Extruded Fenders, Installations-archive, Steel Fabrications, cyclindrical fender, extruded fender, fender panel\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/category\\\/installations-archive\\\/#listItem\",\"name\":\"Installations-archive\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/category\\\/installations-archive\\\/#listItem\",\"position\":2,\"name\":\"Installations-archive\",\"item\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/category\\\/installations-archive\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/category\\\/installations-archive\\\/steel-fabrications\\\/#listItem\",\"name\":\"Steel Fabrications\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/category\\\/installations-archive\\\/steel-fabrications\\\/#listItem\",\"position\":3,\"name\":\"Steel Fabrications\",\"item\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/category\\\/installations-archive\\\/steel-fabrications\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\\\/#listItem\",\"name\":\"APM TERMINALS CALLAO Modernizing Peru\\u2019s Gateway to Global Trade\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/category\\\/installations-archive\\\/#listItem\",\"name\":\"Installations-archive\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\\\/#listItem\",\"position\":4,\"name\":\"APM TERMINALS CALLAO Modernizing Peru\\u2019s Gateway to Global Trade\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/category\\\/installations-archive\\\/steel-fabrications\\\/#listItem\",\"name\":\"Steel Fabrications\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/#organization\",\"name\":\"dockguard.com Global provider of marine fender technology\",\"description\":\"Global provider of marine fender technology\",\"url\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/\",\"telephone\":\"+441525860819\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.dockguard.com\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/DockGuard_logo.png\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\\\/#organizationLogo\",\"width\":630,\"height\":59},\"image\":{\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/facebook.com\\\/\",\"https:\\\/\\\/x.com\\\/\",\"https:\\\/\\\/instagram.com\\\/\",\"https:\\\/\\\/pinterest.com\\\/\",\"https:\\\/\\\/youtube.com\\\/\",\"https:\\\/\\\/linkedin.com\\\/in\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/author\\\/samhudson\\\/#author\",\"url\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/author\\\/samhudson\\\/\",\"name\":\"Sam Hudson\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a94fcc8b1d695f89d36d128f8d4908780390538070616a66d9e5a24299f0ce2e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Sam Hudson\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\\\/#webpage\",\"url\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\\\/\",\"name\":\"APM TERMINALS CALLAO Modernizing Peru\\u2019s Gateway to Global Trade - dockguard.com\",\"description\":\"Project Overview: Case Study: APM TERMINALS CALLAO Modernizing Peru\\u2019s Gateway to Global TradeProject: Terminal Infrustructure UpgradeLocation: Port of Callao, PeruDate: Completed 2021 The Challenge: Scale and Logistics With a requirement for over 130 fender units, the project demanded a partner who could manage large-scale manufacturing without compromising on precision. The logistics were equally complex, requiring\",\"inLanguage\":\"en-GB\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/author\\\/samhudson\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/author\\\/samhudson\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.dockguard.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/20211215_121959-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\\\/#mainImage\",\"width\":2560,\"height\":1391},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\\\/#mainImage\"},\"datePublished\":\"2026-02-06T13:46:21+00:00\",\"dateModified\":\"2026-02-06T13:47:20+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/\",\"name\":\"dockguard.com\",\"description\":\"Global provider of marine fender technology\",\"inLanguage\":\"en-GB\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.dockguard.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global Trade - dockguard.com<\/title>\n\n","aioseo_head_json":{"title":"APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global Trade - dockguard.com","description":"Project Overview: Case Study: APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global TradeProject: Terminal Infrustructure UpgradeLocation: Port of Callao, PeruDate: Completed 2021 The Challenge: Scale and Logistics With a requirement for over 130 fender units, the project demanded a partner who could manage large-scale manufacturing without compromising on precision. The logistics were equally complex, requiring","canonical_url":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"EAp_5lQIT6nXa5tcUrofXDLDOCDzTEu0GFMCm4EJ_Sk","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/#blogposting","name":"APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global Trade - dockguard.com","headline":"APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global Trade","author":{"@id":"https:\/\/www.dockguard.com\/en\/author\/samhudson\/#author"},"publisher":{"@id":"https:\/\/www.dockguard.com\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20211215_121959-scaled.jpg","width":2560,"height":1391},"datePublished":"2026-02-06T13:46:21+00:00","dateModified":"2026-02-06T13:47:20+00:00","inLanguage":"en-GB","mainEntityOfPage":{"@id":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/#webpage"},"isPartOf":{"@id":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/#webpage"},"articleSection":"Extruded Fenders, Installations-archive, Steel Fabrications, cyclindrical fender, extruded fender, fender panel"},{"@type":"BreadcrumbList","@id":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.dockguard.com\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.dockguard.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.dockguard.com\/en\/category\/installations-archive\/#listItem","name":"Installations-archive"}},{"@type":"ListItem","@id":"https:\/\/www.dockguard.com\/en\/category\/installations-archive\/#listItem","position":2,"name":"Installations-archive","item":"https:\/\/www.dockguard.com\/en\/category\/installations-archive\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.dockguard.com\/en\/category\/installations-archive\/steel-fabrications\/#listItem","name":"Steel Fabrications"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.dockguard.com\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.dockguard.com\/en\/category\/installations-archive\/steel-fabrications\/#listItem","position":3,"name":"Steel Fabrications","item":"https:\/\/www.dockguard.com\/en\/category\/installations-archive\/steel-fabrications\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/#listItem","name":"APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global Trade"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.dockguard.com\/en\/category\/installations-archive\/#listItem","name":"Installations-archive"}},{"@type":"ListItem","@id":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/#listItem","position":4,"name":"APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global Trade","previousItem":{"@type":"ListItem","@id":"https:\/\/www.dockguard.com\/en\/category\/installations-archive\/steel-fabrications\/#listItem","name":"Steel Fabrications"}}]},{"@type":"Organization","@id":"https:\/\/www.dockguard.com\/en\/#organization","name":"dockguard.com Global provider of marine fender technology","description":"Global provider of marine fender technology","url":"https:\/\/www.dockguard.com\/en\/","telephone":"+441525860819","logo":{"@type":"ImageObject","url":"https:\/\/www.dockguard.com\/wp-content\/uploads\/2025\/04\/DockGuard_logo.png","@id":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/#organizationLogo","width":630,"height":59},"image":{"@id":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/#organizationLogo"},"sameAs":["https:\/\/facebook.com\/","https:\/\/x.com\/","https:\/\/instagram.com\/","https:\/\/pinterest.com\/","https:\/\/youtube.com\/","https:\/\/linkedin.com\/in\/"]},{"@type":"Person","@id":"https:\/\/www.dockguard.com\/en\/author\/samhudson\/#author","url":"https:\/\/www.dockguard.com\/en\/author\/samhudson\/","name":"Sam Hudson","image":{"@type":"ImageObject","@id":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/a94fcc8b1d695f89d36d128f8d4908780390538070616a66d9e5a24299f0ce2e?s=96&d=mm&r=g","width":96,"height":96,"caption":"Sam Hudson"}},{"@type":"WebPage","@id":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/#webpage","url":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/","name":"APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global Trade - dockguard.com","description":"Project Overview: Case Study: APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global TradeProject: Terminal Infrustructure UpgradeLocation: Port of Callao, PeruDate: Completed 2021 The Challenge: Scale and Logistics With a requirement for over 130 fender units, the project demanded a partner who could manage large-scale manufacturing without compromising on precision. The logistics were equally complex, requiring","inLanguage":"en-GB","isPartOf":{"@id":"https:\/\/www.dockguard.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/#breadcrumblist"},"author":{"@id":"https:\/\/www.dockguard.com\/en\/author\/samhudson\/#author"},"creator":{"@id":"https:\/\/www.dockguard.com\/en\/author\/samhudson\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.dockguard.com\/wp-content\/uploads\/2026\/02\/20211215_121959-scaled.jpg","@id":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/#mainImage","width":2560,"height":1391},"primaryImageOfPage":{"@id":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/#mainImage"},"datePublished":"2026-02-06T13:46:21+00:00","dateModified":"2026-02-06T13:47:20+00:00"},{"@type":"WebSite","@id":"https:\/\/www.dockguard.com\/en\/#website","url":"https:\/\/www.dockguard.com\/en\/","name":"dockguard.com","description":"Global provider of marine fender technology","inLanguage":"en-GB","publisher":{"@id":"https:\/\/www.dockguard.com\/en\/#organization"}}]},"og:locale":"en_GB","og:site_name":"dockguard.com - Global provider of marine fender technology","og:type":"article","og:title":"APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global Trade - dockguard.com","og:description":"Project Overview: Case Study: APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global TradeProject: Terminal Infrustructure UpgradeLocation: Port of Callao, PeruDate: Completed 2021 The Challenge: Scale and Logistics With a requirement for over 130 fender units, the project demanded a partner who could manage large-scale manufacturing without compromising on precision. The logistics were equally complex, requiring","og:url":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/","og:image":"https:\/\/www.dockguard.com\/wp-content\/uploads\/2024\/04\/DG_long_logo_rev.png","og:image:secure_url":"https:\/\/www.dockguard.com\/wp-content\/uploads\/2024\/04\/DG_long_logo_rev.png","article:published_time":"2026-02-06T13:46:21+00:00","article:modified_time":"2026-02-06T13:47:20+00:00","twitter:card":"summary_large_image","twitter:title":"APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global Trade - dockguard.com","twitter:description":"Project Overview: Case Study: APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global TradeProject: Terminal Infrustructure UpgradeLocation: Port of Callao, PeruDate: Completed 2021 The Challenge: Scale and Logistics With a requirement for over 130 fender units, the project demanded a partner who could manage large-scale manufacturing without compromising on precision. The logistics were equally complex, requiring","twitter:image":"https:\/\/www.dockguard.com\/wp-content\/uploads\/2024\/04\/DG_long_logo_rev.png"},"aioseo_meta_data":{"post_id":"4585","title":null,"description":null,"keywords":null,"keyphrases":{"focus":[],"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-08-05 14:28:10","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":{"faqs":[],"keyPoints":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-02-06 13:40:59","updated":"2026-08-25 10:52:41","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.dockguard.com\/en\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.dockguard.com\/en\/category\/installations-archive\/\" title=\"Installations-archive\">Installations-archive<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.dockguard.com\/en\/category\/installations-archive\/steel-fabrications\/\" title=\"Steel Fabrications\">Steel Fabrications<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tAPM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global Trade\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.dockguard.com\/en\/"},{"label":"Installations-archive","link":"https:\/\/www.dockguard.com\/en\/category\/installations-archive\/"},{"label":"Steel Fabrications","link":"https:\/\/www.dockguard.com\/en\/category\/installations-archive\/steel-fabrications\/"},{"label":"APM TERMINALS CALLAO Modernizing Peru\u2019s Gateway to Global Trade","link":"https:\/\/www.dockguard.com\/en\/apm-terminals-callao-modernizing-perus-gateway-to-global-trade\/"}],"_links":{"self":[{"href":"https:\/\/www.dockguard.com\/en\/wp-json\/wp\/v2\/posts\/4585","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dockguard.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dockguard.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dockguard.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dockguard.com\/en\/wp-json\/wp\/v2\/comments?post=4585"}],"version-history":[{"count":2,"href":"https:\/\/www.dockguard.com\/en\/wp-json\/wp\/v2\/posts\/4585\/revisions"}],"predecessor-version":[{"id":4592,"href":"https:\/\/www.dockguard.com\/en\/wp-json\/wp\/v2\/posts\/4585\/revisions\/4592"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dockguard.com\/en\/wp-json\/wp\/v2\/media\/4589"}],"wp:attachment":[{"href":"https:\/\/www.dockguard.com\/en\/wp-json\/wp\/v2\/media?parent=4585"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dockguard.com\/en\/wp-json\/wp\/v2\/categories?post=4585"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dockguard.com\/en\/wp-json\/wp\/v2\/tags?post=4585"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}